3D Coordination
Most companies use BIM as a tool for 3-Dimensional coordination. Conflicts and construction issues can be visually seen in the BIM model by doing a thorough fly through of the model. BIM Solutions can assist in taking your team to the next level by introducing collision detection applications, such as Navisworks, to do an extremely thorough clash detection. These clash detection reports have proven to be an effective way to resolve issues before the actual construction of a project.
4D Coordination
The 4th Dimension in BIM is 3D plus Time. BIM Solutions has the ability to add construction scheduling to 3D models. Once the components in a BIM model have sequencing attached, a virtual build of the project can be reviewed by your project team. BIM Solutions is also very capable of exporting this sequence to a movie for presentation purposes
5D and 6D Coordination
BIM Solutions keeps up with industry trends as the 5th Dimension (Cost) and 6th Dimension (Facilities Management) are coming into play. Adding cost and manufacturer information to a BIM model opens up the full potential of BIM technology. These Dimensions take into account the full life of a building by adding to the value of an already efficient Design and Construction method.